FY2002 ANSS Regional Planning Template
1. Introduction
1.1 Region: (Name)
1.2 Regional Coordinator: (Name)
1.3 Regional Geography: (State/s)
1.4 Regional Working Group: (Names of Members)
1.5 Regional Advisory Committee: (Names of Members)
1.6 Regional issues: (Anything you want to say about unique regional considerations, opportunities, recommendations, strategy)
2. ANSS FY2002 Instrumentation Request
(Assume all equipment will be provided by the USGS)2.1 National
Comments/recommendations with respect to suggested sites
2.2 Regional
2.2.1 Number and locations of regional broadband stations
2.2.2 Suggested deployment schedule (simple timeline or timetable)
Deployment support needed (costs, people, or both)
2.2.3 Cooperators (any regional interests willing to provide support, if so please give nature)
2.3 Urban (ground)
2.3.1 Sites for reference and free-field stations (Number and locations)
2.3.2 Proposed deployment schedule (simple timeline or timetable)
2.3.3 Deployment support needed (costs, people, or both)
2.3.4 Cooperators (Any regional or local interests willing to provide support, if so please give nature)
2.4 Urban (structures)
2.4.1 Number and types of structures
2.4.2 Description of number/type of instrumentation per structure
2.4.3 Rationale for chosen structures/locations
2.4.4 Deployment schedule (simple timeline or timetable)
2.4.5 Deployment support needed (costs, people, or both)
2.4.6 Cooperators (Any regional or local interests willing to provide support, if so please give nature)
2.5 Operations and Maintenance
2.5.1 Assessment of needs for existing (pre-2002) and new (2002) ANSS equipment
2.5.2 Recommendations for efficient regional O&M (We are looking for economies of scale or any other type)
3.0 ANSS FY2002 Information Center(s) Request
Site recommendations
Recommended alert recipients and hierarchy
Recommendations of responsibilities
Listing of desired information/ data for site(s)